1.Throughput Collapse in Heatwaves
Designed weekly capacity: 30 tons | Actual summer 2022 output: 6 tons (only 20% utilization of capacity);
Daily system restarts (3 times) took 2.5 hours each for pump-down;
Order delay rate: 67% | Penalties: over ¥2 million.
2.Quality Crisis: 80× Moisture Excess
Specification: ≤0.15% moisture | Summer reality: 12%;
Purity loss increased rectification energy consumption by 42%;
Return rate: 18% of sales | Complaints: +400% YoY.
3.Energy Drain & Hidden Costs
System power: 82.5 kW (75kW liquid ring + 7.5kW Roots) | Efficiency: <50%;
Contaminated cooling water required ¥86k/year wastewater treatment;
Summer chiller power: extra ¥130k/quarter.